Success Stories
Telis
VSP G200 storage system on a mix of high performance and high capacity disks, connected to Cisco UCS servers and a VMWare environment (Year 2018)
Banco Mercantil Santa Cruz
Design, assembly and adaptation of a 150KVA "Tier III" Datacenter, segmented into Equipment, Network, UPS, Power, NOC, Test and Supplier rooms. Includes a Precision N+1 Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020)
Mosaic International
Next Generation Threat Prevention Appliance, Wired Security Teams, including Professional Services and Collaborative Standard Support (Year 2016)
Linkser
First Hitachi VSP G200 Block Storage System integrated over a Fibre Channel SAN to Cisco Servers with Microsoft Hyper (Year 2017)
Petrobras
Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds the Tier III level (Uptime Institute), with capacity to accommodate 8 racks in an environment with precision air conditioners, UPS regulated power, backup generators and biometric access control mechanisms (Year 2012).
Union Bank
Design, assembly, construction and adaptation of a Datacenter "hot" with capacity for 10 Racks, 2 air inrows, 2 UPS with autonomy of 8 hours, false floor, hot aisle containment, fire system and other subsystems for compliance with the standard "Tier II" (Year 2013-2014).