Nuevatel

Construction and adaptation of 300 outdoor and indoor sites (Radiobases) and antennas (Civil Works) (Year 2009-2013)

Secretary of State for Taxation (SET)

BID PROFOMAF II 240 BR-PR PROJECT of Consultancy for the Adaptation of the Current Data Center and Design of a New Data Center for the SET. Analysis, studies, design and assembly of a 1000 mts2 Data Center complying with the "Telecommunications Industry Association" (TIA-942), ISO 14000, ISO 17799/27001 and BCI ("Business Continuity Institute") standards and complying with "Tier III" standards. (Year 2013)

YPFB Corporation

Consulting, Design, Construction and Implementation of the Data Center for the new VPNO building. Analysis, studies, design and assembly of a Datacenter with capacity for 8 Racks and complying with the "Tier III" standard of the TIA-942, implementing modular, scalable and hot maintainable UPS, own redundant power generation, N+1 air conditioning system, access control, corridor containment and fire system (Year 2015 - 2016).

National Tax Service

HUS-VM Enterprise High End Storage System used to virtualize a DELL storage system and an HP storage system (Year 2014).

Nuevatel

Creation and total design of the first massive National Metro Ethernet IP/MPLS transport network for IP & TDM multiservices (Emulating Circuits) with 350 access nodes nationwide (Year 2011).

YPFB Andina

Design, provision and installation of its Datacenter infrastructure to house high heat and energy density equipment (blades) in a very small space, which complies with the TIA-942 Tier II standard (Year 2012).

Bolivia

ITC Group logo

Santa Cruz

La Paz

Cochabamba